ITAC Assessment: LT0127
ITAC logo
ITAC Assessment: LT0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product DUMP TRAILERS
NAICS
n/a
SIC 3715: Truck Trailers
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 500
pieces
Production Hrs. Annual 2,805
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,133 1,218,933
kWh
Natural Gas $5,658 1,313
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,761

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,320 $2,000 $1,320
26,964
kWh
- -
02 2.7231: Use radiant heater for spot heating $5,340 $5,000 - $5,340
-
MMBtu
-
03 2.7221: Lower temperature during the winter season and vice-versa $1,628 $870 $1,200
24,326
kWh
$428
-
MMBtu
-
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $7,110 $8,880 $7,110
143,611
kWh
- -
05 2.7111: Reduce illumination to minimum necessary levels $216 $30 $216
4,396
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $31 $47 $31
293
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $226 $113 $248
4,103
kWh
- $(-22.0)
TOTAL RECOMMENDED $15,871 $16,940 $10,125
203,693
kWh
$5,768
-
MMBtu
$(-22.0)
TOTAL IMPLEMENTED $8,761 $8,060 $3,015
60,082
kWh
$5,768
-
MMBtu
$(-22.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs