ITAC Assessment: LT0123
ITAC logo
ITAC Assessment: LT0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LAMINATED FLOORING
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 115
Plant Area
n/a
Annual Production 2,500
thousand feet
Production Hrs. Annual 8,568
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,675 3,074,443
kWh
Wood $2,747 100,173
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $10,023 $14,000 $10,500
184,349
kWh
$(-477.0)
-
MMBtu
02 2.4133: Use most efficient type of electric motors $390 $1,131 $390
6,741
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,373 - $2,373
41,618
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $310 - $310
6,448
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $62 $231 $62
1,172
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $45 $641 $45
879
kWh
-
TOTAL RECOMMENDED $13,203 $16,003 $13,680
241,207
kWh
$(-477.0)
-
MMBtu
TOTAL IMPLEMENTED $807 $2,003 $807
15,240
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs