ITAC Assessment: LT0112
ITAC logo
ITAC Assessment: LT0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BRAKESHOES
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 72
Plant Area
n/a
Annual Production 1,100,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,710 1,769,637
kWh
Natural Gas $27,127 5,186
MMBtu
Coal $300,508 60,537
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $3,530 $4,640 - $3,530
-
MMBtu
02 2.6241: Reduce temperature of process equipment when on standby $7,340 - $7,340
247,069
kWh
-
03 2.3212: Optimize plant power factor $2,060 $4,940 $2,060
-
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $655 - $655
10,844
kWh
-
TOTAL RECOMMENDED $13,585 $9,580 $10,055
257,913
kWh
$3,530
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs