ITAC Assessment: LT0096
ITAC logo
ITAC Assessment: LT0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product RAILROAD TIES
NAICS
n/a
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,179 565,944
kWh
Natural Gas $102,778 26,796
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $850 $1,050 $850
13,189
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,574 $300 - $2,574
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,090 $300 - $1,090
-
MMBtu
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,330 $207 - $1,330
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $354 - $354
5,569
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $83 $36 $83
1,172
kWh
-
TOTAL RECOMMENDED $6,281 $1,893 $1,287
19,930
kWh
$4,994
-
MMBtu
TOTAL IMPLEMENTED $6,281 $1,893 $1,287
19,930
kWh
$4,994
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs