ITAC Assessment: LT0084
ITAC logo
ITAC Assessment: LT0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ALUMINUM EXTRUSIONS
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 30,000,000
lb
Production Hrs. Annual 7,272
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $859,246 16,251,173
kWh
Natural Gas $275,888 77,259
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,495 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $92,251

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $7,910 $39,000 $7,910
-
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $420 - $420
10,844
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $344 - $344
8,792
kWh
-
04 2.2437: Recover waste heat from equipment $8,200 $1,200 - $8,200
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,656 $1,300 - $1,656
-
MMBtu
06 2.1232: Keep boiler tubes clean $2,900 $3,000 - $2,900
-
MMBtu
07 2.2511: Insulate bare equipment $2,160 $6,300 - $2,160
-
MMBtu
08 2.2511: Insulate bare equipment $71,905 $5,420 - $71,905
-
MMBtu
TOTAL RECOMMENDED $95,495 $56,220 $8,674
19,636
kWh
$86,821
-
MMBtu
TOTAL IMPLEMENTED $92,251 $53,220 $8,330
10,844
kWh
$83,921
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs