ITAC Assessment: LT0082
ITAC logo
ITAC Assessment: LT0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PIPE AND TUBING
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 1,500
thousand feet
Production Hrs. Annual 6,120
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $471,498 8,785,170
kWh
Natural Gas $160,604 39,327
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,089

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $960 $189 $960
8,499
kWh
-
02 2.2531: Re-size charging openings or add movable cover or door $5,690 - $5,690
102,579
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $339 $96 $339
5,569
kWh
-
04 2.2514: Cover open tanks $12,200 $308 $12,200
219,812
kWh
-
05 2.2514: Cover open tanks $11,400 $6,000 - $11,400
-
MMBtu
06 2.2514: Cover open tanks $23,100 $10,000 - $23,100
-
MMBtu
TOTAL RECOMMENDED $53,689 $16,593 $19,189
336,459
kWh
$34,500
-
MMBtu
TOTAL IMPLEMENTED $30,089 $10,285 $6,989
116,647
kWh
$23,100
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs