ITAC Assessment: LT0071
ITAC logo
ITAC Assessment: LT0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PLYWOOD
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area
n/a
Annual Production 164,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,163,950 24,094,959
kWh
Natural Gas $680,779 186,691
MMBtu
Wood $1,199,900 923,004
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $306,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,039

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $52,000 $6,000 - $52,000
-
MMBtu
-
02 2.1241: Reduce excessive boiler blowdown $20,288 $9,000 - $19,230
-
MMBtu
$1,058
03 2.2211: Use optimum temperature $33,764 $3,000 - $32,000
-
MMBtu
$1,764
04 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $199,300 $690,000 $278,000
6,913,247
kWh
$(-78,700.0)
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $751 $155 - $751
-
MMBtu
-
TOTAL RECOMMENDED $306,103 $708,155 $278,000
6,913,247
kWh
$25,281
-
MMBtu
$2,822
TOTAL IMPLEMENTED $73,039 $15,155 - $71,981
-
MMBtu
$1,058
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs