Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CERAMIC WALL TILE
NAICS
n/a
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 8,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,337 3,669,109
kWh
Natural Gas $519,742 106,724
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,264

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $14,690 $9,500 $(-1,910.0)
(-46,893)
kWh
$16,600
-
MMBtu
-
02 2.2443: Re-use or recycle hot or cold process exhaust air $19,270 $27,600 $(-5,130.0)
(-111,958)
kWh
$24,400
-
MMBtu
-
03 2.3212: Optimize plant power factor $4,264 $8,000 - - $4,264
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $306 $98 $306
5,275
kWh
- -
TOTAL RECOMMENDED $38,530 $45,198 $(-6,734.0)
(-153,576)
kWh
$41,000
-
MMBtu
$4,264
TOTAL IMPLEMENTED $4,264 $8,000 - - $4,264
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs