ITAC Assessment: LT0062
ITAC logo
ITAC Assessment: LT0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CAST ALUMINUM LOGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area
n/a
Annual Production 48,600,000
lb
Production Hrs. Annual 8,518
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,690 2,278,136
kWh
Natural Gas $837,389 211,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $181,409 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,506

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $60,455 $5,000 - $60,935
-
MMBtu
$(-480.0)
02 2.1233: Analyze flue gas for proper air/fuel ratio $7,530 $500 - $8,010
-
MMBtu
$(-480.0)
03 2.6212: Turn off equipment during breaks, reduce operating time $2,521 - - $2,521
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $79,027 $80,080 $(-3,650.0)
(-70,633)
kWh
$82,677
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $20,440 $22,200 $(-3,660.0)
(-70,340)
kWh
$24,100
-
MMBtu
-
06 2.1122: Re-size charging openings or add a movable door on equipment $11,242 - - $11,242
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $194 $187 $194
3,810
kWh
- -
TOTAL RECOMMENDED $181,409 $107,967 $(-7,116.0)
(-137,163)
kWh
$189,485
-
MMBtu
$(-960.0)
TOTAL IMPLEMENTED $70,506 $5,500 - $71,466
-
MMBtu
$(-960.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs