Assessment Year | 1986 |
---|---|
Principal Product | CAST ALUMINUM LOGS |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
n/a
|
Annual Production | 48,600,000
lb
|
Production Hrs. Annual | 8,518
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $117,690 | 2,278,136 |
kWh
|
$0.052 |
Natural Gas | $837,389 | 211,810 |
MMBtu
|
$3.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $181,409 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $70,506 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $60,455 | $5,000 | - |
$60,935
-
MMBtu
|
$(-480.0) | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,530 | $500 | - |
$8,010
-
MMBtu
|
$(-480.0) | |
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,521 | - | - |
$2,521
-
MMBtu
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $79,027 | $80,080 |
$(-3,650.0)
(-70,633)
kWh
|
$82,677
-
MMBtu
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $20,440 | $22,200 |
$(-3,660.0)
(-70,340)
kWh
|
$24,100
-
MMBtu
|
- | |
06 | 2.1122: Re-size charging openings or add a movable door on equipment | $11,242 | - | - |
$11,242
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $194 | $187 |
$194
3,810
kWh
|
- | - | |
TOTAL RECOMMENDED | $181,409 | $107,967 |
$(-7,116.0)
(-137,163)
kWh
|
$189,485
-
MMBtu
|
$(-960.0) | ||
TOTAL IMPLEMENTED | $70,506 | $5,500 | - |
$71,466
-
MMBtu
|
$(-960.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs