ITAC Assessment: LL0249
ITAC logo
ITAC Assessment: LL0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2611: Pulp Mills
Sales Range greater than $500
M
# of Employees 1,250
Plant Area 237,000
ft2
Annual Production 237,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,449,569 262,233,578
kWh
Electricity Demand $4,451,944 478,247
kW-mo/yr
Electricity Fees $259,179 -
Natural Gas $64,907,036 7,652,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $498,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $269,466

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2135: Repair and eliminate steam leaks $158,452 $8,830 - - - $158,452
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $120,454 $320 $119,499
1,101,370
kWh
- $955 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $111,014 $18,240 $110,192
1,015,590
kWh
- $822 - -
04 2.7134: Use photocell controls $85,337 $5,520 $84,660
780,281
kWh
- $677 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,012 $4,200 $4,334
39,946
kWh
- $35 - $3,643
06 2.7111: Reduce illumination to minimum necessary levels $6,963 $105 $5,772
53,202
kWh
$1,136
-
kW-mo/yr
$55 - -
07 2.7135: Install occupancy sensors $5,919 $1,740 $5,872
54,120
kWh
- $47 - -
08 2.2511: Insulate bare equipment $2,138 $1,422 - - - $2,138
-
MMBtu
-
TOTAL RECOMMENDED $498,289 $40,377 $330,329
3,044,509
kWh
$1,136
-
kW-mo/yr
$2,591 $160,590
-
MMBtu
$3,643
TOTAL IMPLEMENTED $269,466 $27,070 $110,192
1,015,590
kWh
- $822 $158,452
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs