ITAC Assessment: LT0060
ITAC logo
ITAC Assessment: LT0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product FIBERGLASS TUBES
NAICS
n/a
SIC 3769: Guided Missile Space Vehicle Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,824 3,233,294
kWh
Natural Gas $56,824 14,086
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,101

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $507 $51 $507
8,206
kWh
-
02 2.2711: Utilize outside air instead of conditioned air for drying $2,484 $900 $2,484
58,030
kWh
-
03 3.4115: Recover and reuse cooling water $40,110 $20,800 $(-4,790.0)
(-111,958)
kWh
$44,900
04 2.3191: Use demand controller or load shedder $26,839 $3,900 $26,839
-
kWh
-
TOTAL RECOMMENDED $69,940 $25,651 $25,040
(-45,722)
kWh
$44,900
TOTAL IMPLEMENTED $43,101 $21,751 $(-1,799.0)
(-45,722)
kWh
$44,900
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs