Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product aluminum milling cutting
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 40,000
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 4,264
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,314 1,343,104
kWh
Electricity Demand $18,386 3,962
kW-mo/yr
Electricity Fees $11,360 -
TOTAL YEARLY COSTS $137,060
RECOMMENDED SAVINGS* $25,069 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 3.5311: Recover and reuse waste material $11,063 - - - $11,063
02 2.7232: Replace existing hvac unit with high efficiency model $6,390 $30,436 $4,806
60,154
kWh
$1,584
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,690 $6,300 $4,020
50,315
kWh
$670
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $2,926 $1,565 $2,926
36,628
kWh
- -
TOTAL RECOMMENDED $25,069 $38,301 $11,752
147,097
kWh
$2,254
-
kW-mo/yr
$11,063
TOTAL IMPLEMENTED $11,080 $36,736 $8,826
110,469
kWh
$2,254
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs