ITAC Assessment: LT0049
ITAC logo
ITAC Assessment: LT0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product RICE
NAICS
n/a
SIC 2044: Rice Milling
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $939,300 19,048,066
kWh
Natural Gas $391,979 102,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,377

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,407 - - $2,007
-
MMBtu
$(-600.0)
02 2.2425: Use flue gases to heat process or service water $19,893 $35,000 - $19,893
-
MMBtu
-
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $11,720 $10,000 - $11,720
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,800 $1,416 $6,800
138,628
kWh
- -
05 2.7261: Install timers and/or thermostats $1,250 $450 $766
17,585
kWh
$484
-
MMBtu
-
TOTAL RECOMMENDED $41,070 $46,866 $7,566
156,213
kWh
$34,104
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $14,377 $10,450 $766
17,585
kWh
$14,211
-
MMBtu
$(-600.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs