ITAC Assessment: LT0036
ITAC logo
ITAC Assessment: LT0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product COPPER TUBING
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 8,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $360,302 6,716,002
kWh
Natural Gas $138,095 27,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,482 $4,000 - $6,482
-
MMBtu
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $12,445 $10,419 $12,597
306,565
kWh
$(-152.0)
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $10,373 - - $10,373
-
MMBtu
04 2.2511: Insulate bare equipment $5,267 $350 - $5,267
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $785 $354 $785
15,240
kWh
-
06 2.2449: Recover heat from exhausted steam, hot air or hot water $1,457 $1,840 - $1,457
-
MMBtu
TOTAL RECOMMENDED $36,809 $16,963 $13,382
321,805
kWh
$23,427
-
MMBtu
TOTAL IMPLEMENTED $17,640 $4,354 $785
15,240
kWh
$16,855
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs