ITAC Assessment: LT0021
ITAC logo
ITAC Assessment: LT0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PELLETIZED BOILER FUEL
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 15
Plant Area
n/a
Annual Production 15,750
ton
Production Hrs. Annual 3,840
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,793 1,087,925
kWh
Natural Gas $206,639 47,751
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,974

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $442 $666 $442
8,792
kWh
- -
02 2.2437: Recover waste heat from equipment $26,802 $44,960 $(-2,824.0)
(-57,737)
kWh
$29,626
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,787 $642 $867
16,999
kWh
- $920
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $745 $1,752 - $745
-
MMBtu
-
TOTAL RECOMMENDED $29,776 $48,020 $(-1,515.0)
(-31,946)
kWh
$30,371
-
MMBtu
$920
TOTAL IMPLEMENTED $2,974 $3,060 $1,309
25,791
kWh
$745
-
MMBtu
$920
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs