| Assessment Year | 1984 |
|---|---|
| Principal Product | STEEL CASTINGS |
| NAICS |
n/a
|
| SIC | 3325: Steel Foundries, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 267 |
| Plant Area |
n/a
|
| Annual Production | 6,000
ton
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $664,901 | 10,852,872 |
kWh
|
$0.061 |
| Natural Gas | $268,840 | 62,193 |
MMBtu
|
$4.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $113,094 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $113,094 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $75,700 | $1,000 | - |
$75,700
-
MMBtu
|
|
| 02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $2,320 | $332 | - |
$2,320
-
MMBtu
|
|
| 03 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $674 | $1,525 | - |
$674
-
MMBtu
|
|
| 04 | 2.3212: Optimize plant power factor | $25,600 | $15,000 |
$25,600
-
kWh
|
- | |
| 05 | 2.3212: Optimize plant power factor | $8,800 | $840 |
$8,800
-
kWh
|
- | |
| TOTAL RECOMMENDED | $113,094 | $18,697 |
$34,400
-
kWh
|
$78,694
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $113,094 | $18,697 |
$34,400
-
kWh
|
$78,694
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs