ITAC Assessment: LT0006
ITAC logo
ITAC Assessment: LT0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product INSTITUTIONAL FURNITURE
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $5
M
to 10
M
# of Employees 182
Plant Area
n/a
Annual Production 231,750
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,438 1,465,123
kWh
Natural Gas $98,933 15,930
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,709

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $610 $300 $610
-
MMBtu
02 3.6123: Burn wood by-products for heat $38,459 $225,000 $38,459
-
MMBtu
03 2.2514: Cover open tanks $1,646 $506 $1,646
-
MMBtu
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $640 $105 $640
-
MMBtu
05 2.2511: Insulate bare equipment $740 $1,600 $740
-
MMBtu
TOTAL RECOMMENDED $42,095 $227,511 $42,095
-
MMBtu
TOTAL IMPLEMENTED $39,709 $225,405 $39,709
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs