ITAC Assessment: LT0004
ITAC logo
ITAC Assessment: LT0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FIBERGLASS BOATS
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area
n/a
Annual Production 3,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,380 414,127
kWh
Natural Gas $29,600 6,175
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,038 $2,373 $2,038
24,912
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $92 - $92
1,172
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,384 - $1,384
16,706
kWh
-
04 2.6218: Turn off equipment when not in use $85 $10 $85
1,172
kWh
-
05 2.7221: Lower temperature during the winter season and vice-versa $966 - - $966
-
MMBtu
06 3.6123: Burn wood by-products for heat $862 $3,802 - $862
-
MMBtu
TOTAL RECOMMENDED $5,427 $6,185 $3,599
43,962
kWh
$1,828
-
MMBtu
TOTAL IMPLEMENTED $4,480 $2,373 $3,514
42,790
kWh
$966
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs