ITAC Assessment: LT0003
ITAC logo
ITAC Assessment: LT0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product OIL FIELD WELLHEADS
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area
n/a
Annual Production 1,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,350 3,426,143
kWh
Natural Gas $104,242 23,988
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,345 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,420 $300 $2,420
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,130 $300 $3,130
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $26,620 $1,200 $26,620
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $295 $160 $295
-
MMBtu
05 2.2514: Cover open tanks $1,300 $300 $1,300
-
MMBtu
06 2.2511: Insulate bare equipment $580 $1,092 $580
-
MMBtu
TOTAL RECOMMENDED $34,345 $3,352 $34,345
-
MMBtu
TOTAL IMPLEMENTED $33,765 $2,260 $33,765
-
MMBtu
Yearly Savings* Imp'd Cost* Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs