ITAC Assessment: LS2411
ITAC logo
ITAC Assessment: LS2411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Roasted Coffee
NAICS 311920: Coffee and Tea Manufacturing
SIC 2095: Roasted Coffee
Sales Range $100
M
to 500
M
# of Employees 54
Plant Area 88,085
ft2
Annual Production 24,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,336 2,854,000
kWh
Electricity Demand $40,804 9,905
kW-mo/yr
Natural Gas $225,508 24,556
MMBtu
TOTAL YEARLY COSTS $553,648
RECOMMENDED SAVINGS* $106,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,595 $50 $5,595
55,398
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $266 $45 $266
2,637
kWh
- -
03 4.424: Improve space comfort conditioning $26,395 $18,900 $(-12,605.0)
(-124,800)
kWh
- $39,000
04 2.4133: Use most efficient type of electric motors $1,962 $12,050 $1,962
19,424
kWh
- -
05 4.652: Replace existing equipment with more suitable substitutes $72,136 $480,000 - $72,136
-
MMBtu
-
TOTAL RECOMMENDED $106,354 $511,045 $(-4,782.0)
(-47,341)
kWh
$72,136
-
MMBtu
$39,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs