ITAC Assessment: LS2408
ITAC logo
ITAC Assessment: LS2408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Canned Fruits And Vegetables
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 22,000
ft2
Annual Production 10,634,724
units
Production Hrs. Annual 3,640
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,497 392,761
kWh
Electricity Demand $6,423 1,558
kW-mo/yr
Natural Gas $17,212 3,983
MMBtu
Fuel Oil #2 $14,148 350
MMBtu
TOTAL YEARLY COSTS $75,280
RECOMMENDED SAVINGS* $95,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,047 $135 $1,047
11,020
kWh
- - - -
02 2.1321: Replace fossil fuel equipment with electrical equipment $37,002 $144,549 - - $13,002
-
MMBtu
$24,000 -
03 2.1224: Replace boiler $57,645 $247,500 - $5,747
-
MMBtu
- - $51,898
TOTAL RECOMMENDED $95,694 $392,184 $1,047
11,020
kWh
$5,747
-
MMBtu
$13,002
-
MMBtu
$24,000 $51,898
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs