Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Chemicals
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 7
Plant Area 139,721
ft2
Annual Production 100,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,203 584,500
kWh
Electricity Demand $6,080 1,476
kW-mo/yr
Natural Gas $29,774 4,088
MMBtu
Fuel Oil #2 $16,248 424
MMBtu
Waste Disposal Costs
Water Usage $8,165 10,103
Tgal
TOTAL YEARLY COSTS $110,470
RECOMMENDED SAVINGS* $16,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,003 $50 $1,003
11,633
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,468 $750 $3,468
40,326
kWh
-
03 4.114: Add/modify equipment to improve drying process $9,410 $28,500 - $9,410
04 2.4133: Use most efficient type of electric motors $2,460 $11,500 $2,460
28,602
kWh
-
TOTAL RECOMMENDED $16,341 $40,800 $6,931
80,561
kWh
$9,410
TOTAL IMPLEMENTED $10,413 $28,550 $1,003
11,633
kWh
$9,410
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs