ITAC Assessment: LS2310
ITAC logo
ITAC Assessment: LS2310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Animal Food
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 300,000
ft2
Annual Production 5,000,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,541 722,274
kWh
Electricity Demand $10,500 2,450
kW-mo/yr
LPG $10,000 1,150
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $1,380 276,000
lb
TOTAL YEARLY COSTS $107,421
RECOMMENDED SAVINGS* $82,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,719

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $1,380 - - - $1,380
-
lb
- - -
02 4.661: Level zero – install control systems for existing equipment $30,000 - - - - - - $30,000
03 2.7135: Install occupancy sensors $3,479 $275 $3,479
29,479
kWh
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $369 $45 $369
3,124
kWh
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,110 $3,822 $9,587
81,242
kWh
$523
-
kW-mo/yr
- - - -
06 3.2176: Increase use of automation $22,704 $21,000 - - - $22,704 - -
07 2.7131: Add area lighting switches $127 $200 $127
1,077
kWh
- - - - -
08 4.811: Demolish old building to reduce tax and insurance bills $14,536 $104,400 - - - - $14,536 -
TOTAL RECOMMENDED $82,705 $129,742 $13,562
114,922
kWh
$523
-
kW-mo/yr
$1,380
-
lb
$22,704 $14,536 $30,000
TOTAL IMPLEMENTED $47,719 $129,267 $9,956
84,366
kWh
$523
-
kW-mo/yr
- $22,704 $14,536 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs