ITAC Assessment: LS2304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 40
Plant Area 720,000
ft2
Annual Production 3,660,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,349,525 19,371,200
kWh
Electricity Demand $424,386 41,728
kW-mo/yr
Natural Gas $239,485 32,626
MMBtu
TOTAL YEARLY COSTS $2,013,396
RECOMMENDED SAVINGS* $151,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,486

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $133,024 $41,910 $133,024
1,900,339
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,461 $3,167 $3,373
48,180
kWh
$1,088
-
kW-mo/yr
03 2.7135: Install occupancy sensors $158 $125 $158
2,264
kWh
-
04 2.4133: Use most efficient type of electric motors $13,867 $56,400 $13,867
198,108
kWh
-
TOTAL RECOMMENDED $151,510 $101,602 $150,422
2,148,891
kWh
$1,088
-
kW-mo/yr
TOTAL IMPLEMENTED $18,486 $59,692 $17,398
248,552
kWh
$1,088
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs