ITAC Assessment: LS2301
ITAC logo
ITAC Assessment: LS2301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Burger Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 81,250
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $395,553 4,699,767
kWh
Electricity Demand $34,901 8,471
kW-mo/yr
Natural Gas $266,172 27,643
MMBtu
Waste Disposal Costs
Water Usage $15,270 14,324
Tgal
TOTAL YEARLY COSTS $711,896
RECOMMENDED SAVINGS* $14,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,721

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $4,756 $400 $4,756
56,614
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,199 $135 $1,199
14,270
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,351 $2,409 $3,141
37,390
kWh
$210
-
kW-mo/yr
04 2.7425: Clean or color roof to reduce solar load $4,956 $10,664 $4,956
59,000
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $459 $2,100 $459
5,468
kWh
-
TOTAL RECOMMENDED $14,721 $15,708 $14,511
172,742
kWh
$210
-
kW-mo/yr
TOTAL IMPLEMENTED $14,721 $15,708 $14,511
172,742
kWh
$210
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs