Assessment Year | 1999 |
---|---|
Principal Product | Optical Lenses and Fused Multifocals |
NAICS |
n/a
|
SIC | 3851: Ophthalmic Goods |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
40,000
ft2
|
Annual Production | 850,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $293,641 | 5,643,611 |
kWh
|
$0.052 |
Electricity Demand | $34,716 | 1,406 |
kW-mo/yr
|
$24.69 |
Electricity Fees | $43,625 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $97,739 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,783 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $10,783 | $36,941 |
$9,005
150,645
kWh
|
$1,778
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,802 | $10,421 |
$4,012
67,116
kWh
|
$790
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $235 | $53 |
$210
3,517
kWh
|
$25
-
kW-mo/yr
|
- | - | |
04 | 3.1175: Use a different or recycled raw material | $720 | $1,800 | - | - |
$720
-
lb
|
- | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $76,792 | - | - | - | - | $76,792 | |
06 | 2.3133: Consider three or four days around-the-clock operation rather than one or two shifts per day | $4,407 | - | - | - | - | $4,407 | |
TOTAL RECOMMENDED | $97,739 | $49,215 |
$13,227
221,278
kWh
|
$2,593
-
kW-mo/yr
|
$720
-
lb
|
$81,199 | ||
TOTAL IMPLEMENTED | $10,783 | $36,941 |
$9,005
150,645
kWh
|
$1,778
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs