| Assessment Year | 2022 |
|---|---|
| Principal Product | Polytetrafluoroethylene |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 28 |
| Plant Area |
110,000
ft2
|
| Annual Production | 1,200
ton
|
| Production Hrs. Annual | 2,990
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $140,450 | 1,830,280 |
kWh
|
$0.077 |
| Electricity Demand | $25,066 | 6,141 |
kW-mo/yr
|
$4.08 |
| Natural Gas | $2,658 | 351 |
MMBtu
|
$7.57 |
| TOTAL YEARLY COSTS | $168,174 | |||
| RECOMMENDED SAVINGS* | $7,743 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,722 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2694: Use highest temperature for chilling or cold storage | $1,066 | $10 |
$1,066
13,891
kWh
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,014 | $25 |
$1,014
13,216
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,034 | $630 |
$4,034
52,566
kWh
|
- | |
| 04 | 2.2625: Chill water to the highest temperature possible | $336 | $250 |
$336
4,383
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $21 | $25 |
$21
270
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,272 | $2,688 |
$1,011
13,179
kWh
|
$261
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $7,743 | $3,628 |
$7,482
97,505
kWh
|
$261
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $7,722 | $3,603 |
$7,461
97,235
kWh
|
$261
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||