ITAC Assessment: LS2206
ITAC logo
ITAC Assessment: LS2206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Polytetrafluoroethylene
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 110,000
ft2
Annual Production 1,200
ton
Production Hrs. Annual 2,990
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,450 1,830,280
kWh
Electricity Demand $25,066 6,141
kW-mo/yr
Natural Gas $2,658 351
MMBtu
TOTAL YEARLY COSTS $168,174
RECOMMENDED SAVINGS* $7,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,722

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2694: Use highest temperature for chilling or cold storage $1,066 $10 $1,066
13,891
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,014 $25 $1,014
13,216
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,034 $630 $4,034
52,566
kWh
-
04 2.2625: Chill water to the highest temperature possible $336 $250 $336
4,383
kWh
-
05 2.7135: Install occupancy sensors $21 $25 $21
270
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,272 $2,688 $1,011
13,179
kWh
$261
-
kW-mo/yr
TOTAL RECOMMENDED $7,743 $3,628 $7,482
97,505
kWh
$261
-
kW-mo/yr
TOTAL IMPLEMENTED $7,722 $3,603 $7,461
97,235
kWh
$261
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs