Assessment Year | 2021 |
---|---|
Principal Product | Alkyl Succinic Anhydrides |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 52 |
Plant Area |
392,000
ft2
|
Annual Production | 65,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $259,176 | 4,338,929 |
kWh
|
$0.060 |
Electricity Demand | $31,253 | 7,557 |
kW-mo/yr
|
$4.14 |
Natural Gas | $829,482 | 80,813 |
MMBtu
|
$10.26 |
TOTAL YEARLY COSTS | $1,119,911 | |||
RECOMMENDED SAVINGS* | $123,931 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,428 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $7,669 | $2,000 | - | - |
$7,669
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,759 | $450 |
$1,759
29,440
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $122 | $154 |
$122
2,039
kWh
|
- | - | |
04 | 2.7134: Use photocell controls | $340 | $555 |
$340
5,694
kWh
|
- | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $113,466 | $218,400 | - | - |
$113,466
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $575 | $2,034 |
$418
6,992
kWh
|
$157
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $123,931 | $223,593 |
$2,639
44,165
kWh
|
$157
-
kW-mo/yr
|
$121,135
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,428 | $2,450 |
$1,759
29,440
kWh
|
- |
$7,669
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs