ITAC Assessment: LS2108
ITAC logo
ITAC Assessment: LS2108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Alkyl Succinic Anhydrides
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 392,000
ft2
Annual Production 65,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,176 4,338,929
kWh
Electricity Demand $31,253 7,557
kW-mo/yr
Natural Gas $829,482 80,813
MMBtu
TOTAL YEARLY COSTS $1,119,911
RECOMMENDED SAVINGS* $123,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,428

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $7,669 $2,000 - - $7,669
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,759 $450 $1,759
29,440
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $122 $154 $122
2,039
kWh
- -
04 2.7134: Use photocell controls $340 $555 $340
5,694
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $113,466 $218,400 - - $113,466
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $575 $2,034 $418
6,992
kWh
$157
-
kW-mo/yr
-
TOTAL RECOMMENDED $123,931 $223,593 $2,639
44,165
kWh
$157
-
kW-mo/yr
$121,135
-
MMBtu
TOTAL IMPLEMENTED $9,428 $2,450 $1,759
29,440
kWh
- $7,669
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs