Assessment Year | 2019 |
---|---|
Principal Product | Phenolic Resin |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
900,000
ft2
|
Annual Production | 15,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $217,645 | 2,672,000 |
kWh
|
$0.081 | |
Natural Gas | $394,786 | 97,072 |
MMBtu
|
$4.07 | |
Waste Disposal Costs | |||||
Water Usage | $21,904 | 6,630 |
Tgal
|
$3.30 | |
TOTAL YEARLY COSTS | $634,335 | ||||
RECOMMENDED SAVINGS* | $43,315 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $19,011 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,092 | $50 |
$2,092
25,687
kWh
|
- | |
02 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $2,408 | - |
$2,408
29,565
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,304 | $6,000 |
$24,304
298,377
kWh
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $1,865 | $3,000 | - |
$1,865
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,646 | $10,000 |
$12,646
156,121
kWh
|
- | |
TOTAL RECOMMENDED | $43,315 | $19,050 |
$41,450
509,750
kWh
|
$1,865
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,011 | $13,050 |
$17,146
211,373
kWh
|
$1,865
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs