ITAC Assessment: LS1904
ITAC logo
ITAC Assessment: LS1904
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Soft Drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 107
Plant Area 301,300
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $997,813 12,355,360
kWh
Natural Gas $315,785 51,582
MMBtu
TOTAL YEARLY COSTS $1,313,598
RECOMMENDED SAVINGS* $549,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $18,805 - - $18,805
-
MMBtu
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,536 - $1,536
19,018
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $414,085 $84,000 $414,085
5,127,386
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,713 $1,530 $5,713
70,737
kWh
-
05 2.1241: Reduce excessive boiler blowdown $20,231 $10,000 - $20,231
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $64,763 $45,810 $64,763
799,537
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $24,052 $20,000 - $24,052
-
MMBtu
TOTAL RECOMMENDED $549,185 $161,340 $486,097
6,016,678
kWh
$63,088
-
MMBtu
TOTAL IMPLEMENTED $85,104 $45,810 $66,299
818,555
kWh
$18,805
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs