Assessment Year | 2019 |
---|---|
Principal Product | Soft Drinks |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $50 M to 100M |
# of Employees | 107 |
Plant Area |
301,300
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $997,813 | 12,355,360 |
kWh
|
$0.081 |
Natural Gas | $315,785 | 51,582 |
MMBtu
|
$6.12 |
TOTAL YEARLY COSTS | $1,313,598 | |||
RECOMMENDED SAVINGS* | $549,185 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $85,104 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $18,805 | - | - |
$18,805
-
MMBtu
|
|
02 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $1,536 | - |
$1,536
19,018
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $414,085 | $84,000 |
$414,085
5,127,386
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,713 | $1,530 |
$5,713
70,737
kWh
|
- | |
05 | 2.1241: Reduce excessive boiler blowdown | $20,231 | $10,000 | - |
$20,231
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $64,763 | $45,810 |
$64,763
799,537
kWh
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $24,052 | $20,000 | - |
$24,052
-
MMBtu
|
|
TOTAL RECOMMENDED | $549,185 | $161,340 |
$486,097
6,016,678
kWh
|
$63,088
-
MMBtu
|
||
TOTAL IMPLEMENTED | $85,104 | $45,810 |
$66,299
818,555
kWh
|
$18,805
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs