| Assessment Year | 2018 |
|---|---|
| Principal Product | Oil and Gas Field Machinery Equipment |
| NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
77,400
ft2
|
| Annual Production | 6,300
units
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $66,976 | 689,500 |
kWh
|
$0.097 | |
| Other Gas | $51,600 | 7,000 |
MMBtu
|
$7.37 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,303 | 695 |
Tgal
|
$4.75 | |
| TOTAL YEARLY COSTS | $121,879 | ||||
| RECOMMENDED SAVINGS* | $63,174 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $2,571 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $374 | $25 |
$374
3,851
kWh
|
- | |
| 02 | 2.7135: Install occupancy sensors | $1,421 | $50 |
$1,421
14,648
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $483 | $75 |
$483
4,980
kWh
|
- | |
| 04 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $1,150 | $100 |
$1,150
11,836
kWh
|
- | |
| 05 | 4.111: Add equipment/ operators to reduce production bottleneck | $45,500 | $27,000 | - | $45,500 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,246 | $21,652 |
$14,246
146,871
kWh
|
- | |
| TOTAL RECOMMENDED | $63,174 | $48,902 |
$17,674
182,186
kWh
|
$45,500 | ||
| TOTAL IMPLEMENTED | $2,571 | $150 |
$2,571
26,484
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs