ITAC Assessment: LS1901
ITAC logo
ITAC Assessment: LS1901
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Oil and Gas Field Machinery Equipment
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 77,400
ft2
Annual Production 6,300
units
Production Hrs. Annual 3,120
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,976 689,500
kWh
Other Gas $51,600 7,000
MMBtu
Waste Disposal Costs
Water Usage $3,303 695
Tgal
TOTAL YEARLY COSTS $121,879
RECOMMENDED SAVINGS* $63,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,571

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Increase in Production Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $374 $25 $374
3,851
kWh
-
02 2.7135: Install occupancy sensors $1,421 $50 $1,421
14,648
kWh
-
03 2.7135: Install occupancy sensors $483 $75 $483
4,980
kWh
-
04 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,150 $100 $1,150
11,836
kWh
-
05 4.111: Add equipment/ operators to reduce production bottleneck $45,500 $27,000 - $45,500
06 2.7142: Utilize higher efficiency lamps and/or ballasts $14,246 $21,652 $14,246
146,871
kWh
-
TOTAL RECOMMENDED $63,174 $48,902 $17,674
182,186
kWh
$45,500
TOTAL IMPLEMENTED $2,571 $150 $2,571
26,484
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs