Assessment Year | 2018 |
---|---|
Principal Product | Wastewater/Sewage Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 44 |
Plant Area |
2,875,000
ft2
|
Annual Production | 73,000,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,886,430 | 29,463,000 |
kWh
|
$0.064 |
Natural Gas | $34,875 | 5,472 |
MMBtu
|
$6.37 |
TOTAL YEARLY COSTS | $1,921,305 | |||
RECOMMENDED SAVINGS* | $323,113 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $377 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $377 | $68 |
$377
5,887
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,290 | $265 |
$1,290
20,151
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41,129 | $25,545 |
$41,129
642,634
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $40,029 | $66,000 |
$40,029
625,302
kWh
|
- | |
05 | 2.1336: Install equipment to utilize waste fuel | $7,510 | $13,000 | - |
$7,510
-
MMBtu
|
|
06 | 2.4131: Size electric motors for peak operating efficiency | $232,778 | $428,000 |
$232,778
3,637,152
kWh
|
- | |
TOTAL RECOMMENDED | $323,113 | $532,878 |
$315,603
4,931,126
kWh
|
$7,510
-
MMBtu
|
||
TOTAL IMPLEMENTED | $377 | $68 |
$377
5,887
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs