ITAC Assessment: LS1422
ITAC logo
ITAC Assessment: LS1422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Elementary School
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 75
Plant Area 114,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,483 697,336
kWh
Electricity Demand $10,856 2,643
kW-mo/yr
TOTAL YEARLY COSTS $77,339
RECOMMENDED SAVINGS* $20,029 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,171

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $590 $200 $590
6,215
kWh
-
02 2.7423: Reduce heat gain by window tinting $7,066 $2,925 $7,066
74,384
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,581 $7,172 $4,706
49,540
kWh
$875
-
kW-mo/yr
04 2.7425: Clean or color roof to reduce solar load $5,400 $11,760 $5,400
56,842
kWh
-
05 4.662: Level one – add communication using iiot devices to existing control system to modify operations $1,392 $5,200 $1,392
14,644
kWh
-
TOTAL RECOMMENDED $20,029 $27,257 $19,154
201,625
kWh
$875
-
kW-mo/yr
TOTAL IMPLEMENTED $6,171 $7,372 $5,296
55,755
kWh
$875
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs