ITAC Assessment: LS0824
ITAC logo
ITAC Assessment: LS0824
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Engineering Building
NAICS 921110: Executive Offices
SIC 1542: General Contractors-Nonresidential Buildings, Other than Industrial Buildings and Warehouses
Sales Range less than $500
k
# of Employees 100
Plant Area 75,000
ft2
Annual Production 8,760
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $453,870 5,887,200
kWh
Electricity Demand $124,456 13,144
kW-mo/yr
TOTAL YEARLY COSTS $578,326
RECOMMENDED SAVINGS* $58,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $3,108 $500 $3,108
40,359
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $24,280 $14,300 $20,776
269,808
kWh
$3,504
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $248 $1,232 $248
2,819
kWh
-
04 2.2622: Replace existing chiller with high efficiency model $30,838 $216,450 $30,838
400,500
kWh
-
TOTAL RECOMMENDED $58,474 $232,482 $54,970
713,486
kWh
$3,504
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs