Assessment Year | 2017 |
---|---|
Principal Product | Blasting/Coating Service |
NAICS | 213112: Support Activities for Oil and Gas Operations |
SIC | 8711: Engineering Services |
Sales Range | $1 M to 5M |
# of Employees | 38 |
Plant Area |
348,480
ft2
|
Annual Production | 700,000
units
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $81,331 | 770,440 |
kWh
|
$0.11 |
Electricity Fees | $2,926 | - |
|
- |
Natural Gas | $8,826 | 827 |
MMBtu
|
$10.67 |
Fuel Oil #1 | $18,000 | 1,114 |
MMBtu
|
$16.16 |
TOTAL YEARLY COSTS | $111,083 | |||
RECOMMENDED SAVINGS* | $7,001 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,436 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,268 | - |
$3,268
28,680
kWh
|
- | - | - | |
02 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $1,143 | $420 |
$1,143
10,033
kWh
|
- | - | - | |
03 | 4.322: Eliminate old stock and modify inventory control | $520 | $1,200 | - | $520 | - | - | |
04 | 2.7135: Install occupancy sensors | $257 | - |
$257
2,255
kWh
|
- | - | - | |
05 | 3.7198: Reduce / eliminate use of disposable product | $430 | $380 | - | - | - | $430 | |
06 | 3.7223: Install shrouding on machines to prevent splashing | $1,040 | - | - | $1,040 | - | - | |
07 | 2.8123: Pay utility bills on time | $343 | - | - | - | $343 | - | |
TOTAL RECOMMENDED | $7,001 | $2,000 |
$4,668
40,968
kWh
|
$1,560 | $343 | $430 | ||
TOTAL IMPLEMENTED | $2,436 | $2,000 |
$1,143
10,033
kWh
|
$520 | $343 | $430 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs