ITAC Assessment: LM0115
ITAC logo
ITAC Assessment: LM0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product electronic capacitors
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675: Electronic Capacitors
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 25,000
ft2
Annual Production 1,500,000,000
pieces
Production Hrs. Annual 8,712
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,231 2,839,480
kWh
Electricity Demand $39,072 5,046
kW-mo/yr
Electricity Fees $15,280 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,535 $200 $5,003
47,840
kWh
$532
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $947 $200 $856
8,188
kWh
$91
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $1,573 - $1,422
13,599
kWh
$151
-
kW-mo/yr
- -
04 4.122: Develop standard procedures to improve internal yields $55,692 $7,875 $2,692
28,395
kWh
- $3,000 $50,000
TOTAL RECOMMENDED $63,747 $8,275 $9,973
98,022
kWh
$774
-
kW-mo/yr
$3,000 $50,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs