ITAC Assessment: LM0114
ITAC logo
ITAC Assessment: LM0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product wood panel and molding
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 182
Plant Area 193,000
ft2
Annual Production 16,500,000
thousand feet
Production Hrs. Annual 4,267
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,421 2,259,773
kWh
Electricity Demand $155,884 10,167
kW-mo/yr
Electricity Fees $30,926 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $194,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4226: Use / purchase optimum sized compressor $2,544 - $1,704
20,979
kWh
$840
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,286 $9,409 $7,262
88,624
kWh
$4,024
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $811 - $539
6,640
kWh
$272
-
kW-mo/yr
-
04 4.431: Train operators for maximum operating efficiency $175,670 $14,400 $170
2,055
kWh
- $175,500
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,671 $200 $3,178
38,195
kWh
$1,493
-
kW-mo/yr
-
TOTAL RECOMMENDED $194,982 $24,009 $12,853
156,493
kWh
$6,629
-
kW-mo/yr
$175,500
TOTAL IMPLEMENTED $8,026 $200 $5,421
65,814
kWh
$2,605
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs