Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product asphalt shingles
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 167,000
ft2
Annual Production 200,000
thousand feet
Production Hrs. Annual 8,520
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,880 5,567,782
kWh
Electricity Demand $201,629 10,781
kW-mo/yr
Electricity Fees $61,793 -
Natural Gas $944,143 128,830
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $894,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $653,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings
01 2.2211: Use optimum temperature $1,018 - - - $1,018
-
MMBtu
- - -
02 2.2511: Insulate bare equipment $2,109 $3,000 - - $2,109
-
MMBtu
- - -
03 2.4133: Use most efficient type of electric motors $879 $5,000 $648
9,316
kWh
$231
-
kW-mo/yr
- - - -
04 2.7111: Reduce illumination to minimum necessary levels $5,249 $522 $4,578
40,466
kWh
$671
-
kW-mo/yr
- - - -
05 4.322: Eliminate old stock and modify inventory control $235,359 $7,000 - - - $4,363
-
MMBtu
$142,776 $88,220
06 4.611: Begin a practice of predictive / preventative maintenance $650,132 - $5,066
72,770
kWh
- - - - $645,066
TOTAL RECOMMENDED $894,746 $15,522 $10,292
122,552
kWh
$902
-
kW-mo/yr
$3,127
-
MMBtu
$4,363
-
MMBtu
$142,776 $733,286
TOTAL IMPLEMENTED $653,120 $8,000 $5,714
82,086
kWh
$231
-
kW-mo/yr
$2,109
-
MMBtu
- - $645,066
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs