Assessment Year | 2006 |
---|---|
Principal Product | asphalt shingles |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
167,000
ft2
|
Annual Production | 200,000
thousand feet
|
Production Hrs. Annual | 8,520
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $343,880 | 5,567,782 |
kWh
|
$0.062 |
Electricity Demand | $201,629 | 10,781 |
kW-mo/yr
|
$18.70 |
Electricity Fees | $61,793 | - |
|
- |
Natural Gas | $944,143 | 128,830 |
MMBtu
|
$7.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $894,746 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $653,120 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $1,018 | - | - | - |
$1,018
-
MMBtu
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $2,109 | $3,000 | - | - |
$2,109
-
MMBtu
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $879 | $5,000 |
$648
9,316
kWh
|
$231
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $5,249 | $522 |
$4,578
40,466
kWh
|
$671
-
kW-mo/yr
|
- | - | - | - | |
05 | 4.322: Eliminate old stock and modify inventory control | $235,359 | $7,000 | - | - | - |
$4,363
-
MMBtu
|
$142,776 | $88,220 | |
06 | 4.611: Begin a practice of predictive / preventative maintenance | $650,132 | - |
$5,066
72,770
kWh
|
- | - | - | - | $645,066 | |
TOTAL RECOMMENDED | $894,746 | $15,522 |
$10,292
122,552
kWh
|
$902
-
kW-mo/yr
|
$3,127
-
MMBtu
|
$4,363
-
MMBtu
|
$142,776 | $733,286 | ||
TOTAL IMPLEMENTED | $653,120 | $8,000 |
$5,714
82,086
kWh
|
$231
-
kW-mo/yr
|
$2,109
-
MMBtu
|
- | - | $645,066 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs