ITAC Assessment: LM0107
ITAC logo
ITAC Assessment: LM0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Digital labels
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 25,000
ft2
Annual Production 2,000,000
thousand feet
Production Hrs. Annual 3,510
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,949 246,813
kWh
Electricity Demand $12,373 1,308
kW-mo/yr
Electricity Fees $3,071 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $446,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $442,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings Increase in Production Savings
01 2.7232: Replace existing hvac unit with high efficiency model $3,522 $2,400 $3,522
24,288
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,219 $2,200 $1,503
17,064
kWh
$716
-
kW-mo/yr
- - -
03 4.122: Develop standard procedures to improve internal yields $225,208 $12,980 $131
1,542
kWh
$77
-
kW-mo/yr
$225,000 - -
04 4.625: Develop standard operating procedures $178,334 $5,400 $(-1,047.0)
(-12,341)
kWh
$(-619.0)
-
kW-mo/yr
- - $180,000
05 4.212: Adopt in-house material generation $16,864 $1,000 $(-1,319.0)
(-14,980)
kWh
$(-2,857.0)
-
kW-mo/yr
- $21,040 -
06 4.111: Add equipment/ operators to reduce production bottleneck $20,251 $1,000 $(-471.0)
(-5,553)
kWh
$(-278.0)
-
kW-mo/yr
- - $21,000
TOTAL RECOMMENDED $446,398 $24,980 $2,319
10,020
kWh
$(-2,961.0)
-
kW-mo/yr
$225,000 $21,040 $201,000
TOTAL IMPLEMENTED $442,876 $22,580 $(-1,203.0)
(-14,268)
kWh
$(-2,961.0)
-
kW-mo/yr
$225,000 $21,040 $201,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs