ITAC Assessment: LM0105
ITAC logo
ITAC Assessment: LM0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Store fixtures
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 151,878
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,008
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,894 765,561
kWh
Electricity Demand $29,862 3,384
kW-mo/yr
Electricity Fees $11,593 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,004 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $638 - $421
4,189
kWh
$217
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,156 $960 $2,082
20,041
kWh
$1,074
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,197 $250 $2,694
28,196
kWh
$1,503
-
kW-mo/yr
-
04 4.625: Develop standard operating procedures $48,035 $1,500 $345
3,427
kWh
- $47,690
05 4.322: Eliminate old stock and modify inventory control $3,978 $1,000 $218
2,173
kWh
- $3,760
TOTAL RECOMMENDED $60,004 $3,710 $5,760
58,026
kWh
$2,794
-
kW-mo/yr
$51,450
TOTAL IMPLEMENTED $59,366 $3,710 $5,339
53,837
kWh
$2,577
-
kW-mo/yr
$51,450
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs