| Assessment Year | 2005 |
|---|---|
| Principal Product | plastic parts |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 65 |
| Plant Area |
28,800
ft2
|
| Annual Production | 50,000
lb
|
| Production Hrs. Annual | 2,168
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $95,014 | 1,211,057 |
kWh
|
$0.078 |
| Electricity Demand | $50,906 | 5,868 |
kW-mo/yr
|
$8.68 |
| Electricity Fees | $4,118 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $280,722 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $103,962 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.625: Develop standard operating procedures | $48,120 | $4,921 | - | - |
$(-850.0)
-
MMBtu
|
$48,970 | |
| 02 | 4.431: Train operators for maximum operating efficiency | $10,000 | $6,000 | - | - | - | $10,000 | |
| 03 | 4.431: Train operators for maximum operating efficiency | $166,760 | $6,090 | - | - | - | $166,760 | |
| 04 | 4.513: Re-arrange equipment layout to reduce labor costs | $53,375 | $1,500 | - | - | - | $53,375 | |
| 05 | 4.122: Develop standard procedures to improve internal yields | $1,250 | - | - | - | - | $1,250 | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $284 | $50 |
$176
2,233
kWh
|
$108
-
kW-mo/yr
|
- | - | |
| 07 | 2.4133: Use most efficient type of electric motors | $933 | $35,082 |
$575
7,302
kWh
|
$358
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $280,722 | $53,643 |
$751
9,535
kWh
|
$466
-
kW-mo/yr
|
$(-850.0)
-
MMBtu
|
$280,355 | ||
| TOTAL IMPLEMENTED | $103,962 | $41,553 |
$751
9,535
kWh
|
$466
-
kW-mo/yr
|
$(-850.0)
-
MMBtu
|
$103,595 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs