Assessment Year | 2005 |
---|---|
Principal Product | corrugated boxes |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
190,000
ft2
|
Annual Production | 9,975,000
lb
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $201,899 | 5,182,739 |
kWh
|
$0.039 |
Electricity Demand | $101,494 | 12,108 |
kW-mo/yr
|
$8.38 |
Electricity Fees | $4,495 | - |
|
- |
Natural Gas | $494,931 | 70,761 |
MMBtu
|
$6.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,227 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,412 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,130 | $500 |
$2,320
59,490
kWh
|
$810
-
kW-mo/yr
|
- | - | - | |
02 | 2.2136: Install / repair insulation on steam lines | $2,502 | $983 | - | - |
$2,502
-
MMBtu
|
- | - | |
03 | 4.652: Replace existing equipment with more suitable substitutes | $57,780 | $50,000 | - | - | - | $45,780 | $12,000 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,187 | $34,080 |
$10,659
273,726
kWh
|
$3,528
-
kW-mo/yr
|
- | - | - | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,628 | - |
$1,970
50,580
kWh
|
$658
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $80,227 | $85,563 |
$14,949
383,796
kWh
|
$4,996
-
kW-mo/yr
|
$2,502
-
MMBtu
|
$45,780 | $12,000 | ||
TOTAL IMPLEMENTED | $63,412 | $51,483 |
$2,320
59,490
kWh
|
$810
-
kW-mo/yr
|
$2,502
-
MMBtu
|
$45,780 | $12,000 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs