ITAC Assessment: LM0094
ITAC logo
ITAC Assessment: LM0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product corrugated boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 190,000
ft2
Annual Production 9,975,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,899 5,182,739
kWh
Electricity Demand $101,494 12,108
kW-mo/yr
Electricity Fees $4,495 -
Natural Gas $494,931 70,761
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,227 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,412

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,130 $500 $2,320
59,490
kWh
$810
-
kW-mo/yr
- - -
02 2.2136: Install / repair insulation on steam lines $2,502 $983 - - $2,502
-
MMBtu
- -
03 4.652: Replace existing equipment with more suitable substitutes $57,780 $50,000 - - - $45,780 $12,000
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,187 $34,080 $10,659
273,726
kWh
$3,528
-
kW-mo/yr
- - -
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,628 - $1,970
50,580
kWh
$658
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $80,227 $85,563 $14,949
383,796
kWh
$4,996
-
kW-mo/yr
$2,502
-
MMBtu
$45,780 $12,000
TOTAL IMPLEMENTED $63,412 $51,483 $2,320
59,490
kWh
$810
-
kW-mo/yr
$2,502
-
MMBtu
$45,780 $12,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs