Assessment Year | 2005 |
---|---|
Principal Product | furniture |
NAICS | 337121: Upholstered Household Furniture Manufacturing |
SIC | 2512: Wood Household Furniture, Upholstered |
Sales Range | $1 M to 5M |
# of Employees | 25 |
Plant Area |
30,000
ft2
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $10,648 | 101,280 |
kWh
|
$0.11 |
Electricity Demand | $5,426 | 662 |
kW-mo/yr
|
$8.20 |
Electricity Fees | $127 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,347 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,161 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,671 | $380 |
$1,168
11,115
kWh
|
$503
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $163 | - |
$114
1,087
kWh
|
$49
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,655 | $4,550 |
$1,159
11,008
kWh
|
$496
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $368 | $150 |
$272
2,578
kWh
|
$96
-
kW-mo/yr
|
- | - | |
05 | 4.513: Re-arrange equipment layout to reduce labor costs | $26,400 | - | - | - | $26,400 | - | |
06 | 3.7211: Modify material application methods | $7,090 | $800 | - | - | - | $7,090 | |
TOTAL RECOMMENDED | $37,347 | $5,880 |
$2,713
25,788
kWh
|
$1,144
-
kW-mo/yr
|
$26,400 | $7,090 | ||
TOTAL IMPLEMENTED | $35,161 | $1,180 |
$1,168
11,115
kWh
|
$503
-
kW-mo/yr
|
$26,400 | $7,090 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs