ITAC Assessment: LM0089
ITAC logo
ITAC Assessment: LM0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 30,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,648 101,280
kWh
Electricity Demand $5,426 662
kW-mo/yr
Electricity Fees $127 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,347 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,161

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,671 $380 $1,168
11,115
kWh
$503
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $163 - $114
1,087
kWh
$49
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,655 $4,550 $1,159
11,008
kWh
$496
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $368 $150 $272
2,578
kWh
$96
-
kW-mo/yr
- -
05 4.513: Re-arrange equipment layout to reduce labor costs $26,400 - - - $26,400 -
06 3.7211: Modify material application methods $7,090 $800 - - - $7,090
TOTAL RECOMMENDED $37,347 $5,880 $2,713
25,788
kWh
$1,144
-
kW-mo/yr
$26,400 $7,090
TOTAL IMPLEMENTED $35,161 $1,180 $1,168
11,115
kWh
$503
-
kW-mo/yr
$26,400 $7,090
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs