ITAC Assessment: LM0077
ITAC logo
ITAC Assessment: LM0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Glass Doors
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 53
Plant Area 41,700
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,137 767,683
kWh
Electricity Demand $49,864 6,144
kW-mo/yr
Electricity Fees $(-553.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,020

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,750 $3,825 $1,449
15,986
kWh
$301
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $117 - $95
1,124
kWh
$22
-
kW-mo/yr
-
03 2.4238: Do not use compressed air for personal cooling $91 $100 $91
1,081
kWh
- -
04 4.431: Train operators for maximum operating efficiency $36,400 $8,800 - - $36,400
05 4.513: Re-arrange equipment layout to reduce labor costs $812 - - - $812
06 2.7142: Utilize higher efficiency lamps and/or ballasts $997 $1,920 $814
8,986
kWh
$183
-
kW-mo/yr
-
TOTAL RECOMMENDED $40,167 $14,645 $2,449
27,177
kWh
$506
-
kW-mo/yr
$37,212
TOTAL IMPLEMENTED $1,020 $100 $186
2,205
kWh
$22
-
kW-mo/yr
$812
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs