Assessment Year | 2004 |
---|---|
Principal Product | Plastic and Metal Fixtures |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
87,000
ft2
|
Annual Production | 2,500,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $198,632 | 1,576,092 |
kWh
|
$0.13 |
Electricity Demand | $45,854 | 4,740 |
kW-mo/yr
|
$9.67 |
Electricity Fees | $25,302 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,807 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,094 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,620 | - |
$1,344
11,963
kWh
|
$276
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $110 | - |
$88
872
kWh
|
$22
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,713 | $17,500 |
$14,439
128,561
kWh
|
$3,274
-
kW-mo/yr
|
- | |
04 | 2.2611: Moderate cooling tower outlet temperature | $2,061 | - |
$2,061
18,348
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $102 | $96 |
$102
905
kWh
|
- | - | |
06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,201 | - | - | - |
$1,201
-
Tgal
|
|
TOTAL RECOMMENDED | $22,807 | $17,596 |
$18,034
160,649
kWh
|
$3,572
-
kW-mo/yr
|
$1,201
-
Tgal
|
||
TOTAL IMPLEMENTED | $5,094 | $96 |
$3,595
32,088
kWh
|
$298
-
kW-mo/yr
|
$1,201
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs