ITAC Assessment: LM0067
ITAC logo
ITAC Assessment: LM0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Open/Closed Die and Upset Forging
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 165,000
ft2
Annual Production 70,293
pieces
Production Hrs. Annual 2,635
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,178 840,939
kWh
Electricity Demand $27,785 3,396
kW-mo/yr
Electricity Fees $6,559 -
Natural Gas $262,716 41,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $198,383 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $140,918

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $418 $165 $418
3,367
kWh
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,055 - $806
6,492
kWh
$249
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,647 $2,176 $1,422
10,382
kWh
$225
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $272 $247 $209
1,687
kWh
$63
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $114 $50 - - $114
-
MMBtu
- -
06 3.3131: Use evaporation to concentrate material $2,465 $5,500 $(-2,203.0)
(-18,912)
kWh
- - $4,668
-
gal
-
07 4.426: Modify workload $45,760 $570 - - - - $45,760
08 4.426: Modify workload $10,652 $5,500 - - - - $10,652
09 4.426: Modify workload $81,000 $9,400 - - - - $81,000
10 4.426: Modify workload $55,000 $500 - - - - $55,000
TOTAL RECOMMENDED $198,383 $24,108 $652
3,016
kWh
$537
-
kW-mo/yr
$114
-
MMBtu
$4,668
-
gal
$192,412
TOTAL IMPLEMENTED $140,918 $18,108 $2,855
21,928
kWh
$537
-
kW-mo/yr
$114
-
MMBtu
- $137,412
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs