ITAC Assessment: LM0045
ITAC logo
ITAC Assessment: LM0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product heat treating service
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area 26,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,255 763,300
kWh
Electricity Demand $19,367 2,364
kW-mo/yr
Electricity Fees $(-549.0) -
Natural Gas $168,138 32,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $426,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,431

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $2,878 $5,000 - - $2,878
-
MMBtu
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,317 $1,000 - - $4,317
-
MMBtu
- - -
03 2.7124: Make a practice of turning off lights when not needed $3,903 - $3,724
27,581
kWh
$179
-
kW-mo/yr
- - - -
04 3.3131: Use evaporation to concentrate material $3,478 $5,500 - - - $3,478
-
Tgal
- -
05 4.111: Add equipment/ operators to reduce production bottleneck $37,050 $11,250 - - - - - $37,050
06 4.731: Advertise product or service $198,750 $2,000 - - - - $198,750 -
07 4.111: Add equipment/ operators to reduce production bottleneck $176,517 $2,000 - - - - $176,517 -
TOTAL RECOMMENDED $426,893 $26,750 $3,724
27,581
kWh
$179
-
kW-mo/yr
$7,195
-
MMBtu
$3,478
-
Tgal
$375,267 $37,050
TOTAL IMPLEMENTED $44,431 $16,750 $3,724
27,581
kWh
$179
-
kW-mo/yr
- $3,478
-
Tgal
- $37,050
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs