ITAC Assessment: LM0037
ITAC logo
ITAC Assessment: LM0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product thermal processing
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 48
Plant Area 20,000
ft2
Annual Production 5,850,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $364,474 4,339,980
kWh
Electricity Demand $139,613 12,072
kW-mo/yr
Electricity Fees $23,780 -
Natural Gas $145,141 20,242
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
01 2.7232: Replace existing hvac unit with high efficiency model $1,266 $1,050 $1,018
7,667
kWh
$248
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,665 $2,150 $1,478
12,813
kWh
$187
-
kW-mo/yr
- - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,259 $1,700 - $4,935
-
kW-mo/yr
$3,324 - -
04 2.2414: Use waste heat from hot flue gases to preheat $24,595 $27,000 - - - $24,595
-
MMBtu
-
05 2.2515: Use optimum thickness insulation $1,908 $306 - - - $1,908
-
MMBtu
-
06 2.2511: Insulate bare equipment $755 $224 $755
7,040
kWh
- - - -
07 4.111: Add equipment/ operators to reduce production bottleneck $45,000 $40,000 - - - - $45,000
08 4.431: Train operators for maximum operating efficiency $17,066 $14,227 - - - - $17,066
TOTAL RECOMMENDED $100,514 $86,657 $3,251
27,520
kWh
$5,370
-
kW-mo/yr
$3,324 $26,503
-
MMBtu
$62,066
TOTAL IMPLEMENTED $8,259 $1,700 - $4,935
-
kW-mo/yr
$3,324 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs