ITAC Assessment: LM0035
ITAC logo
ITAC Assessment: LM0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product drawn steel wire
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 70,000
ft2
Annual Production 45,000
ton
Production Hrs. Annual 7,248
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $746,316 9,465,403
kWh
Electricity Demand $229,678 23,316
kW-mo/yr
Electricity Fees $142,635 -
Natural Gas $23,459 3,385
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $337,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $191,744

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,856 $968 $3,318
32,442
kWh
$538
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,044 $2,500 $899
8,787
kWh
$145
-
kW-mo/yr
- - -
03 2.4131: Size electric motors for peak operating efficiency $1,191 $1,700 $1,025
10,016
kWh
$166
-
kW-mo/yr
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $8,944 $9,000 - - $8,944
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,619 - $3,114
30,446
kWh
$505
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,034 $4,200 $3,874
28,006
kWh
$160
-
kW-mo/yr
- - -
07 2.7144: Install spectral reflectors / delamp $2,027 $1,395 $1,947
14,078
kWh
$80
-
kW-mo/yr
- - -
08 4.322: Eliminate old stock and modify inventory control $135,000 $5,000 - - - - $135,000
09 4.625: Develop standard operating procedures $103,000 $4,250 - - - $103,000 -
10 4.122: Develop standard procedures to improve internal yields $75,000 $24,500 - - - $75,000 -
TOTAL RECOMMENDED $337,715 $53,513 $14,177
123,775
kWh
$1,594
-
kW-mo/yr
$8,944
-
MMBtu
$178,000 $135,000
TOTAL IMPLEMENTED $191,744 $38,118 $12,230
109,697
kWh
$1,514
-
kW-mo/yr
- $178,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs