ITAC Assessment: LM0034
ITAC logo
ITAC Assessment: LM0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product plastic film
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 185
Plant Area 122,000
ft2
Annual Production 75,000,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,749,487 25,802,712
kWh
Electricity Demand $447,343 43,284
kW-mo/yr
Electricity Fees $110,501 -
Natural Gas $750 67
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7144: Install spectral reflectors / delamp $20,645 $300 $18,072
183,434
kWh
$2,573
-
kW-mo/yr
-
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $6,353 $1,480 $4,266
43,297
kWh
$2,087
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,937 $200 $4,113
41,758
kWh
$604
-
kW-mo/yr
$(-780.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,911 - $3,411
34,623
kWh
$500
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $2,006 $2,640 $1,756
17,823
kWh
$250
-
kW-mo/yr
-
06 2.2515: Use optimum thickness insulation $6,347 $900 $5,527
56,097
kWh
$820
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,199 $5,520 $37,145
377,032
kWh
$6,834
-
kW-mo/yr
$(-780.0)
TOTAL IMPLEMENTED $26,562 $2,940 $23,239
235,880
kWh
$3,323
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs